This product is emergency power source system which by unifying fast charging station and battery facilities, enables long-time stable power supply for at the time of disaster. We play an active part as charge station and electricity peak cut system in normal. In addition, we can utilize electricity which generated electricity for own house consumption and securing of emergency power source if we add PV system.

Use

01.Emergency power source
  • We can stably supply electricity to important load such as lighting or air-conditioner in building at the time of blackout using ability of EV for generation, accumulation of electricity and battery for emplacement
  • If electricity of in-vehicle battery of EV is short, supplying power for long term is possible by spare operation of vehicle containing
  • Power supply is possible to ministry of three load apparatus that large-capacity electricity including elevator is necessary
  • At the time of return from blackout, is automatic without letting power supply cut off; available for reconnection in commercial school (during patent application)
02.Fast charging station
  • We can use as up to five fast charging stations
  • We reduce electricity peak at the time of EV charge and can reduce increase of electric base rate
03.Electricity peak cut system
  • We equalize electricity demand in building using battery and battery for emplacement which we put on EV and reduce electric bill

    ※B03 is bells and whistles.

Features

We automatically change power supply function

Station controller equipped with us's original autonomy distributed coordination control technology "Synergy Link" recognizes normal time and the situation in emergency, each function all; is automatic, and station controller equipped with realization us's original autonomy distributed coordination control technology "Synergy Link" by the most suitable operation that accepted change, the situation recognizes normal and the situation in emergency, is realization by all most suitable operation that is automatic, and accepted change, the situation by each function

※B03 is bells and whistles.

Juxtaposition of photovoltaic power generation is possible, too

Construction of system which considered equal environment only sunlight with charge electricity to EV if we add sunlight system is enabled and contributes to CO2 reduction

B01
We realize space-saving setting construction shortening

It is placeable in space for one parking lot, and setting is possible again in a minimum period of one day

B03
Compact design

Placement that is flexible with two cube shapes with high design is possible

A little at battery capacity

We make battery capacity small quantity and are most suitable for Small start

Specifications

Item B01 B03
Setting image
B01
B03
Specifications System
juhodendenryoku
(maximum)
50kW
The output voltage Ministry of three
6,600V
Ministry of three
210V
Frequency 50/60 Hz
Battery capacity 50kWh 14kWh
EV ju
Discharger connection
Possible number
Five
Setting
Place
The outskirts
Environment
Altitude 1,000m above sea level or less
Use place The outdoors
Ambient temperature -10 degrees Celsius - 40 degrees Celsius
The neighborhood atmosphere Is flammable, is corrosive
Liquid ・
Gas
Do not exist
Having damage from salt breeze or not Nothing
The snow 1.0m
The following
0.6m
The following

Introduction video